Tuesday, June 2, 2009

AIM Documents and its relevant Information.

Hi All,
Download the AIM templates from the following link:
http://www.bryanthompsononline.com/oracle/2008/05/06/download-oracle-aim-applications-implementation-methodology-software/
Different Phases:
======================================
Business Process Architecture (BP)


  • BP.010 Define Business and Process Strategy
  • BP.020 Catalog and Analyze Potential Changes
  • BP.030 Determine Data Gathering Requirements
  • BP.040 Develop Current Process Model
  • BP.050 Review Leading Practices
  • BP.060 Develop High-Level Process Vision
  • BP.070 Develop High-Level Process Design
  • BP.080 Develop Future Process Model
  • BP.090 Document Business Procedure

======================================
Business Requirements Definition (RD)

  • RD.010 Identify Current Financial and Operating Structure
  • RD.020 Conduct Current Business Baseline
  • RD.030 Establish Process and Mapping Summary
  • RD.040 Gather Business Volumes and Metrics
  • RD.050 Gather Business Requirements
  • RD.060 Determine Audit and Control Requirements
  • RD.070 Identify Business Availability Requirements
  • RD.080 Identify Reporting and Information Access Requirements

======================================
Business Requirements Mapping

  • BR.010 Analyze High-Level Gaps
  • BR.020 Prepare mapping environment
  • BR.030 Map Business requirements
  • BR.040 Map Business Data
  • BR.050 Conduct Integration Fit Analysis
  • BR.060 Create Information Model
  • BR.070 Create Reporting Fit Analysis
  • BR.080 Test Business Solutions
  • BR.090 Confirm Integrated Business Solutions
  • BR.100 Define Applications Setup
  • BR.110 Define security Profiles

======================================
Application and Technical Architecture (TA)

  • TA.010 Define Architecture Requirements and Strategy
  • TA.020 Identify Current Technical Architecture
  • TA.030 Develop Preliminary Conceptual Architecture
  • TA.040 Define Application Architecture
  • TA.050 Define System Availability Strategy
  • TA.060 Define Reporting and Information Access Strategy
  • TA.070 Revise Conceptual Architecture
  • TA.080 Define Application Security Architecture
  • TA.090 Define Application and Database Server Architecture
  • TA.100 Define and Propose Architecture Subsystems
  • TA.110 Define System Capacity Plan
  • TA.120 Define Platform and Network Architecture
  • TA.130 Define Application Deployment Plan
  • TA.140 Assess Performance Risks
  • TA.150 Define System Management Procedures

======================================
Module Design and Build (MD)

  • MD.010 Define Application Extension Strategy
  • MD.020 Define and estimate application extensions
  • MD.030 Define design standards
  • MD.040 Define Build Standards
  • MD.050 Create Application extensions functional design
  • MD.060 Design Database extensions
  • MD.070 Create Application extensions technical design
  • MD.080 Review functional and Technical designs
  • MD.090 Prepare Development environment
  • MD.100 Create Database extensions
  • MD.110 Create Application extension modules
  • MD.120 Create Installation routines

======================================
Data Conversion (CV)

  • CV.010 Define data conversion requirements and strategy
  • CV.020 Define Conversion standards
  • CV.030 Prepare conversion environment
  • CV.040 Perform conversion data mapping
  • CV.050 Define manual conversion procedures
  • CV.060 Design conversion programs
  • CV.070 Prepare conversion test plans
  • CV.080 Develop conversion programs
  • CV.090 Perform conversion unit tests
  • CV.100 Perform conversion business objects
  • CV.110 Perform conversion validation tests
  • CV.120 Install conversion programs
  • CV.130 Convert and verify data

======================================

Documentation (DO)

  • DO.010 Define documentation requirements and strategy
  • DO.020 Define Documentation standards and procedures
  • DO.030 Prepare glossary
  • DO.040 Prepare documentation environment
  • DO.050 Produce documentation prototypes and templates
  • DO.060 Publish user reference manual
  • DO.070 Publish user guide
  • DO.080 Publish technical reference manual
  • DO.090 Publish system management guide

======================================
Business System Testing (TE)

  • TE.010 Define testing requirements and strategy
  • TE.020 Develop unit test script
  • TE.030 Develop link test script
  • TE.040 Develop system test script
  • TE.050 Develop systems integration test script
  • TE.060 Prepare testing environments
  • TE.070 Perform unit test
  • TE.080 Perform link test
  • TE.090 perform installation test
  • TE.100 Prepare key users for testing
  • TE.110 Perform system test
  • TE.120 Perform systems integration test
  • TE.130 Perform Acceptance test

======================================

PERFORMACE TESTING(PT)

  • PT.010 - Define Performance Testing Strategy
  • PT.020 - Identify Performance Test Scenarios
  • PT.030 - Identify Performance Test Transaction
  • PT.040 - Create Performance Test Scripts
  • PT.050 - Design Performance Test Transaction Programs
  • PT.060 - Design Performance Test Data
  • PT.070 - Design Test Database Load Programs
  • PT.080 - Create Performance Test Transaction Programs
  • PT.090 - Create Test Database Load Programs
  • PT.100 - Construct Performance Test Database
  • PT.110 - Prepare Performance Test Environment
  • PT.120 - Execute Performance Test

======================================
Adoption and Learning (AP)

  • AP.010 - Define Executive Project Strategy
  • AP.020 - Conduct Initial Project Team Orientation
  • AP.030 - Develop Project Team Learning Plan
  • AP.040 - Prepare Project Team Learning Environment
  • AP.050 - Conduct Project Team Learning Events
  • AP.060 - Develop Business Unit Managers Readiness Plan
  • AP.070 - Develop Project Readiness Roadmap
  • AP.080 - Develop and Execute Communication Campaign
  • AP.090 - Develop Managers' Readiness Plan
  • AP.100 - Identify Business Process Impact on Organization
  • AP.110 - Align Human Performance SupportSystems
  • AP.120 - Align Information Technology Groups
  • AP.130 - Conduct User Learning Needs Analysis
  • AP.140 - Develop User Learning Plan
  • AP.150 - Develop User Learningware
  • AP.160 - Prepare User Learning Environment
  • AP.170 - Conduct User Learning Events
  • AP.180 - Conduct Effectiveness Assessment

======================================

Production Migration (PM)

  • PM.010 - Define Transition Strategy
  • PM.020 - Design Production Support Infrastructure
  • PM.030 - Develop Transition and Contingency Plan
  • PM.040 - Prepare Production Environment
  • PM.050 - Set Up Applications
  • PM.060 - Implement Production Support Infrastructure
  • PM.070 - Verify Production Readiness
  • PM.080 - Begin Production
  • PM.090 - Measure System Performance
  • PM.100 - Maintain System
  • PM.110 - Refine Production System
  • PM.120 - Decommission Former Systems
  • PM.130 - Propose Future Business Direction
  • PM.140 - Propose Future Technical Direction

No comments:

Post a Comment